
-
Wolf return stratification set 8616505 for FWS-2-60, FWS-2-80, BSPAvailable for order delivery time: 10-28 working daysShipping Cost Points: 500 -
Wolf thermal insulation 1669275 for air 2000 , match0 "Available for order delivery time: 10-28 working daysShipping Cost Points: 19 -
Wolf Cob universal pan 2651460 24-45 °, DN186, flexible lead apron, plastic, blackAvailable for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf Cob exhaust pipe 2651333 250 mm, DN 160, PPAvailable for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf Mgk basic kit 2651292 DN 160/200, room air dependentAvailable for order delivery time: 10-28 working daysShipping Cost Points: 500 -
Wolf roof duct 2651655 DN 80 / 125, 1000 mm, stainless steel / polypropylene, for air / exhaust pipe facadeShort notice delivery delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf Cob inspection piece 2651660 DN 80 / 125, 250 mm, for air / exhaust pipe facade, stainless steel / polypropyleneShort notice delivery delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf bend 2651483 30 °, DN 80 / 125, pluggable, whiteShort notice delivery delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf kit 2651501 DN 80 / 125, up to 50 kW, room air independent, for flue gas pipe facadeShort notice delivery delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf connection set 2651554 DN 110/160, room air-independent, for installation in a duct, whiteAvailable for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf connection set 7701126 flow / return, for connection left or right on the CSZ-2Available for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf hot / cold water connection set 7701136 for connection on the left, right, rear of the CSZ-2Available for order delivery time: 10-28 working daysShipping Cost Points: 100
** Average Wholesale Price