A Youtube video has been blocked because its use was rejected in the privacy settings. If you want to view it, please adjust the privacy settings to allow Youtube service. You have the right to revoke or change your decision at any time.
The store will not work correctly when cookies are disabled.
Addition of approx. 2000 l per 200 l system content
Approximately 4 weeks after adding JTH-R, the system will be thoroughly flushed
multiple applications may be necessary
In a clean system, refill and add THERMODOS L
Notice
Please note that gas and electric appliances require increased mains voltage for proper operation. These appliances are not equipped with a two-pin mains plug. The installation of non-pluggable appliances must be carried out by the respective network operator or a certified specialist company, which can also assist you in obtaining any necessary approval from the relevant network operator for the installation of the appliance.