-
MHG combi block without pressure switch 96.34500-7007 230V, for GWB15 / 25/45/75/77, from 04/2004Available for order delivery time: 10-28 working daysShipping Cost Points: 10 -
Judo hardness tester 8742120 for the determination of the total water hardnessAvailable for order delivery time: 10-28 working daysShipping Cost Points: 50 -
Judo replacement cartridge 8068531 25000, full desalinationAvailable for order delivery time: 10-28 working daysShipping Cost Points: 500 -
Bertrams Polyline LAS standard kit 2 41STBF80-2 DN 80 / 125, shaft DN 80 , VA mouthAvailable for order delivery time: 10-28 working daysShipping Cost Points: 1000 -
Wolf CWL Excellent ISO pipe reducer 2577404 DN 160/125Short notice delivery delivery time: 10-28 working daysShipping Cost Points: 10 -
Zehnder cover set 889308 chrome, for heating element WIVAR II / WIVAR HotelAvailable for order delivery time: 10-28 working daysShipping Cost Points: 50 -
Wolf Sem additional electric heater 2792017 6 kW / 3 x 400 V, with storage tank temperature controllerAvailable for order delivery time: 10-28 working daysShipping Cost Points: 500 -
Wolf Sem Thermometer 2039052 for SEW- 2000 -300/400, SEM-1W-360, SEM1, for standing memoryAvailable for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf carrying straps 2444 140 up to 500 l, 2 tensioning straps with carrying loops eachAvailable for order delivery time: 10-28 working daysShipping Cost Points: 100 -
Wolf Spu buffer tank 2483051 1000 l, with smooth tube heat exchanger, silverAvailable for order delivery time: 10-28 working daysShipping Cost Points: 5000 -
Wolf Sm1-2 heat meter set 2744610 Qn 2.5 / 5 cbm / h, for solarAvailable for order delivery time: 10-28 working daysShipping Cost Points: 250 -
Wolf Bsh circulation lance 2000 ", for buffer storageAvailable for order delivery time: 10-28 working daysShipping Cost Points: 85
** Average Wholesale Price